Agent Systems Lab ยท Synthetic study SIM-27B
Simulation timeline
Ordered observations from one reproducible, synthetic run; timestamps are relative to run start.
Data status: Synthetic scenario; no production systems or real agents are represented.
| Time | Observation | Coordination implication |
|---|---|---|
| 00:00 | Snapshot e41 reports all zones below their placement ceiling. | Agents start from the same epoch. |
| 08:20 | East interactive p95 rises from 74 ms to 126 ms; batch throughput is unchanged. | The latency agent proposes moving 12 units of interactive work West. |
| 09:05 | The capacity agent sees East at 78% utilization and proposes adding 8 units there. | Its cache still references e41. |
| 09:18 | The reliability agent reduces available West capacity by 10 units to model a maintenance reserve. | New snapshot e42 is published. |
| 09:31 | The latency proposal based on e41 and the capacity proposal based on e41 are both marked feasible in isolation. | After e42, the West move exceeds the revised ceiling and consumes the full transfer budget, leaving no correction headroom. |
| 10:00 | No placement is committed in this seed run. | The unresolved question is how to arbitrate, refresh and seek approval. |
These are scenario events, not observations from a deployed service.