Agent Systems Lab ยท Synthetic study SIM-27B

Simulation timeline

Ordered observations from one reproducible, synthetic run; timestamps are relative to run start.

Data status: Synthetic scenario; no production systems or real agents are represented.

TimeObservationCoordination implication
00:00Snapshot e41 reports all zones below their placement ceiling.Agents start from the same epoch.
08:20East interactive p95 rises from 74 ms to 126 ms; batch throughput is unchanged.The latency agent proposes moving 12 units of interactive work West.
09:05The capacity agent sees East at 78% utilization and proposes adding 8 units there.Its cache still references e41.
09:18The reliability agent reduces available West capacity by 10 units to model a maintenance reserve.New snapshot e42 is published.
09:31The latency proposal based on e41 and the capacity proposal based on e41 are both marked feasible in isolation.After e42, the West move exceeds the revised ceiling and consumes the full transfer budget, leaving no correction headroom.
10:00No placement is committed in this seed run.The unresolved question is how to arbitrate, refresh and seek approval.

These are scenario events, not observations from a deployed service.